Dundonnell Wind Farm — 168 MW cap

VIC · Discretionary · V_DUNDWF1_2_3_168
Most frequent constraint: Discretionary upper limit on Dundonnell WF (1 + 2 + 3) generation of 168 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
191
% of period
8.8%
Network as built share
0.0%
Equipment outage share
1.4%
Single-plant limit share
99%
Units in constraints
5
MW in constraints
920
Curtailed while constrained
22.7 GWh
Value of that curtailment
$0.2m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V_DUNDWF1_2_3_168188Limit on a single plantDiscretionaryDiscretionary upper limit on Dundonnell WF (1 + 2 + 3) generation of 168 MW
V_V_HYAPD1_13Equipment outageVoltage StabilityOut = Heywood to Alcoa Portland 500kV No.1 line (HYTS-APD). Limit voltage unbalance at the APD 500 kV bus and Heywood 275 kV bus
V_DUNDWF_56WT1Limit on a single plantSystem StrengthDundonnell wind farm turbine limit of 56. Constraint to violate if Dundonnell Wind Farm number of turbine availability greater than 56. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
MortlakeOCGT2921.00discharge
MortlakeOCGT2921.00discharge
Dundonnell Wind FarmWind1681.00discharge
Dundonnell Wind FarmWind1221.00discharge
Dundonnell Wind FarmWind461.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
APD, HYTSLINE APD_HYTS1_50013 Nov 2026 05:3013 Nov 2026 16:30WD REQHV equipt maintenance3
APD, HYTSLINE APD_HYTS1_50013 Nov 2026 04:3013 Nov 2026 16:30RESUBMITHV equipt maintenance3
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.