NEM Dashboard

ITK
Period

Golden Plains Wind Farm East — discretionary cap

VIC · Discretionary · V_GPWF_600
Most frequent constraint: Limit total Golden Plains wind farm upper limit to 600 MW
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
1
% of period
0.0%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
3
MW in constraints
756
Curtailed while constrained
0.2 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
V_GPWF_85WT1Limit on a single plantSystem StrengthGolden Plains wind farm turbine limit of 85. Constraint to violate if Golden Plains Wind Farm number of turbine availability greater than 85. Swamp out otherwise. DS only

Units behind it

UnitFuelMWWeightDirection
Golden Plains Wind Farm EastWind2601.00discharge
Golden Plains Wind Farm EastWind2481.00discharge
Golden Plains Wind Farm EastWind2481.00discharge

Associated outages

No associated outage overlapped this period.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.