Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output
VIC · System Strength · V_SH_DD_MAC_FLT_965
Most frequent constraint: Limit Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output to 965 MW if Heywood flow is above 500 MW (SA to VIC direction). Swamp otherwise. This is to manage voltage oscillation.
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
24
% of period
1.1%
Network as built share
0.0%
Equipment outage share
0.0%
Single-plant limit share
100%
Units in constraints
13
MW in constraints
3,239
Curtailed while constrained
5.5 GWh
Value of that curtailment
$0.0m
Network as built: the limit binds with every line and transformer in service. AEMO marks these “Out = Nil”.
Equipment outage: the limit applies only while a named line or transformer is out of service.
Limit on a single plant: AEMO caps one wind or solar farm. Most are system strength limits, which depend on how many coal, gas or hydro units and synchronous condensers are running nearby.
Constraint-hours by cause, per month
Network as builtEquipment outageLimit on a single plant
Constraints that bound in the period
Constraint
Hours
Cause
Limit type
AEMO description
V_SH_DD_MAC_FLT_965
24
Limit on a single plant
System Strength
Limit Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output to 965 MW if Heywood flow is above 500 MW (SA to VIC direction). Swamp otherwise. This is to manage voltage oscillation.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.