Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength

SA · System Strength · V_VS_LB_HY_250
Most frequent constraint: Limiting V-SA + Lake Bonney WF <= 250 MW when SA is at risk of separation. Constraint swamp out when Lake Bonney tripping scheme is O/S
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Binding hours
22
% of period
1.0%
Network as built share
0.0%
Equipment outage share
3.8%
Single-plant limit share
96%
Units in constraints
3
MW in constraints
278
Curtailed while constrained
0.0 GWh
Value of that curtailment
$0.0m

Constraint-hours by cause, per month

Network as builtEquipment outageLimit on a single plant

Constraints that bound in the period

ConstraintHoursCauseLimit typeAEMO description
SV_250_LKB_DYN14Limit on a single plantDiscretionarySA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Limit dynamically reduced when actual flow exceeds limit by at least 10 MW. Limit reduced by amount of exceedance, capped at 25 MW. Constraint swamped if trip scheme O/S
S_ISLE_LKB1+2+3_603Limit on a single plantDiscretionaryDiscretionary upper limit on Lake Bonney (1+2+3) windfarms<=60 MW & No. in-service wind turbines for LKB at 41 Turbines.(Note otherwise, LKB 2+3 +1 will be constrained to 0 MW) (Note: swamped when Lake Bonney Tripping scheme is I/S)
V_VS_LB_HY_2503Limit on a single plantSystem StrengthLimiting V-SA + Lake Bonney WF <= 250 MW when SA is at risk of separation. Constraint swamp out when Lake Bonney tripping scheme is O/S
SV_250_LKB2Limit on a single plantDiscretionarySA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Constraint swamped if trip scheme O/S
S_V_ROCOF1Equipment outageROC FrequencyOut = South Australia at credible risk of separation from NEM, limit SA to VIC Heywood interconnection flow to prevent Rate of Change of Frequency exceeding 1 Hz/sec in SA immediately following separation. Considers Lake Bonney WF trip scheme

Units behind it

UnitFuelMWWeightDirection
Lake Bonney 2 Wind FarmWind1591.00charge
Lake Bonney 2 Wind FarmWind1591.00discharge
Lake Bonney 1 Wind FarmWind801.00charge
Lake Bonney 1 Wind FarmWind801.00discharge
Lake Bonney 3 Wind FarmWind391.00charge
Lake Bonney 3 Wind FarmWind391.00discharge

Associated outages

SubstationEquipmentStartEndStatusReasonBinding hours (whole outage)
S_EAST, HYTSLINE HYTS_SESS1_275, TRANS M1TR14 Oct 2026 07:0014 Oct 2026 16:00COMPLETEHV equipt maintenance8
HYTS, S_EASTLINE HYTS_SESS1_275, CB CB6603, CB CB802914 Oct 2026 07:0014 Oct 2026 16:00COMPLETEHV equipt commissioning8
HYTS, S_EASTCB CB6609, LINE HYTS_SESS2_275, CB CB80282 Nov 2026 08:152 Nov 2026 15:30COMPLETEHV equipt maintenance7
HYTS, S_EASTCB CB6609, LINE HYTS_SESS2_275, CB CB80288 Sep 2026 21:009 Sep 2026 06:00COMPLETEHV equipt commissioning3
S_EAST, HYTSLINE HYTS_SESS2_27515 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance2
RCTSLINE CPTS_RCTS_220, CAP 2CAP_220, BUS 7MN2, LINE X915 Oct 2026 06:3015 Oct 2026 19:30COMPLETEHV equipt maintenance2
S_EASTCB CB6609, CB CB802815 Oct 2026 07:0015 Oct 2026 16:00COMPLETEHV equipt maintenance2
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.