Bolivar Power Station

OCGT · SA · BOLIVPS1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
128 MW
Intervals limited
0.3%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−1,215 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
S_PPT+SNPT+BLVR_220SA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW7dischargeSA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW (Note: Constraint swamps out if Bolivar PS is at 0MW)
S>>PAPG_PPLF_PGPSSA Pelican Point + Snapper Point generation +Bolivar PS<= 220 MW0dischargeOut= Para to Parafield Gardens West 275kV, avoid O/L Parafield gardens west-Parafield Gardens 66kV on trip of Pelican Pt-Lefever 275kV line, Feedback
Source: AEMO. Summary built 25 Nov 2026 03:11; data through 25 Nov 2026 02:10 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.