Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
100 MW
Intervals discharge-limited
12%
Intervals charge-limited
1.0%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−74 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N>NIL_977_976One Canberra to Queanbeyan (977/1 or 976/1)22chargeOut= Nil, avoid O/L of one Canberra to Queanbeyan (977/1 or 976/1) 132kV line on trip of other Canberra to Queanbeyan (977/1 or 976/1) 132kV line, Feedback
N::N_GRRP_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)4dischargeOut = Gullen Range to Rye Park (3P), stability limit (Snowy-NSW) for loss of Yass-Marulan (4/5) 330kV line
N::N_DTKV_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)2dischargeOut = Dapto - Kangaroo Valley (18) 330kV line, transient stability limit (Snowy-NSW) for loss of one 330kV line between Yass and Bannaby/Marulan with summated flow on 4+5+61 <=1500
N>976_977_NIL_2One Canberra to Queanbeyan (977/1 or 976/1)0dischargeOut= Canberra to Queanbeyan (976/1 or 977/1) 132kV line, avoid O/L Queanbeyan to Canberra (976/3 or 977/1) on trip of Nil, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.