| S>>BWMP_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 42 | discharge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S_CRK+POR03_25 | Cathedral Rocks + Mt Millar Wind Farm + Port Lincoln GT — discretionary cap | 30 | discharge | Discretionary upper limit for Cathedral Rocks WF + Port Lincoln GT3 generation <= 25 MW |
| S^NIL_SA_NORTH | Manage voltage collapse in northern SA for the trip of one 275kV line | 24 | discharge | Out = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S) |
| S>>NIL_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 16 | discharge | Out= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>BWMP_DVBR_RHBG-T | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | discharge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback |
| S>>BWMP_BRTW_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | discharge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback |
| S>>BWMP_HUWT_RHBG-T | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | discharge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill-Brinkworth 132kV T line on trip of Hummocks-Waterloo 132kV line, Feedback |
| S>>BRTW_BWPA_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | discharge | Out= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback |
| S>>NIL_BWMP_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 2 | discharge | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback |
| SA_ISLE_STRENGTH | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | discharge | Maximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV). |
| S_DVCL_270 | Out=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV | 1 | discharge | Out=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV line 2, discretionary upper limit for Cathedral Rocks WF + Mount Millar WF + Lincoln Gap WF+ Lincoln Gap Battery+ Pt Lincoln GTs <= 270 MW |
| S>>CNRB_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | discharge | Out= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>CNRB_BWPA_RHBR-T | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | discharge | Out= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback |
| S>>NIL_BRTW_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 0 | discharge | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback |
| S>HUWT_BWPA_RHBR-T | Manage voltage collapse in northern SA for the trip of one 275kV line | 0 | discharge | Out= Hummocks-Waterloo 132kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback |