| I_6F_SN_150 | Of 150 MW on Bundey | 46 | charge | Discretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW) |
| V::S_SETB_TBSE_2 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 9 | discharge | Out= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines. |
| S>V_NIL_SETX_SETX1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 7 | discharge | Out= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| V::S_BLKRG_MAXG_3 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 5 | discharge | Out = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA. |
| S>>NIL_TUTB_TUTB_1 | Tungkillo-Tailem Bend 1 or 2 | 4 | charge | Out= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback |
| SV_HEY_600_TEST | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 4 | discharge | Out = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade |
| V::S_BDBU_MAXG_1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 3 | discharge | Out = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available). |
| S_ISLE_CANUNDA_35 | Canunda — discretionary cap | 3 | discharge | Discretionary upper limit on Canunda windfarm<=35MW & No. in-service wind turbines for canunda at 23 Turbines.(Note otherwise,Canunda will be constrained to 0 MW) |
| S::V_NIL_TBSE_2 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 3 | charge | Out = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines. |
| S>KHKN_SETX_SETX1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 2 | discharge | Out= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| CA_SYDS_59E0BEF5_1 | Tungkillo-Tailem Bend 1 or 2 | 2 | charge | Constraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD) |
| S::V_TBSE_TBSE | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 2 | charge | Out = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines. |
| S:V_BLKRG_550 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 2 | discharge | Out = both or one Black Range series capacitors O/S, SA to VIC on Heywood upper transfer limit of 550 MW based on oscillatory stability. |
| SA_ISLE_STRENGTH | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | discharge | Maximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV). |
| SA_SETB_B | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 1 | charge | Out = South East to Tailem Bend 275 kV line, SA Islanded for loss of parallel line by SAIT RAS scheme, limit contingency at VIC-SA separation point to < 250 MW in SA to VIC direction |