NEM Dashboard

ITK
Period

Canunda

Wind · SA · CNUNDAWF
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
46 MW
Intervals limited
1.8%
Curtailed while constrained
0.2 GWh
Other curtailment
8.5 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−14 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
I_6F_SN_150Of 150 MW on Bundey46chargeDiscretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW)
V::S_SETB_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage9dischargeOut= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines.
S>V_NIL_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage7dischargeOut= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
V::S_BLKRG_MAXG_3Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage5dischargeOut = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA.
S>>NIL_TUTB_TUTB_1Tungkillo-Tailem Bend 1 or 24chargeOut= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback
SV_HEY_600_TESTVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage4dischargeOut = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade
V::S_BDBU_MAXG_1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage3dischargeOut = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available).
S_ISLE_CANUNDA_35Canunda — discretionary cap3dischargeDiscretionary upper limit on Canunda windfarm<=35MW & No. in-service wind turbines for canunda at 23 Turbines.(Note otherwise,Canunda will be constrained to 0 MW)
S::V_NIL_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage3chargeOut = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>KHKN_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage2dischargeOut= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
CA_SYDS_59E0BEF5_1Tungkillo-Tailem Bend 1 or 22chargeConstraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD)
S::V_TBSE_TBSEVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage2chargeOut = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines.
S:V_BLKRG_550Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage2dischargeOut = both or one Black Range series capacitors O/S, SA to VIC on Heywood upper transfer limit of 550 MW based on oscillatory stability.
SA_ISLE_STRENGTHManage voltage collapse in northern SA for the trip of one 275kV line1dischargeMaximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
SA_SETB_BVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage1chargeOut = South East to Tailem Bend 275 kV line, SA Islanded for loss of parallel line by SAIT RAS scheme, limit contingency at VIC-SA separation point to < 250 MW in SA to VIC direction
Showing the 15 constraints with the most hours; 7 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.