Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
142 MW
Intervals limited
1.7%
Curtailed while constrained
0.1 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−269 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>NIL_9MLCrudine Ridge to Ilford Tee (9ML)9dischargeOut= Nil, avoid O/L Crudine Ridge to Ilford Tee (9ML) on trip of Nil, Feedback. Metering is used as specified in OM520
N>NIL_75_WOTX_72Central-west NSW: Molong–Orange North 132 kV8dischargeOut= Nil, avoid O/L Wollar West - Wollar (75) 330kV line or Wollar 330/500kV transformer on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N>79_998_72Central-west NSW: Molong–Orange North 132 kV7chargeOut= Stubbo to Uungula (79) or Uungula to Wellington (7J) 330kV line, avoid O/L on Cowra to Forbes North (998) on trip of Mt Piper to Wellington line (72), Feedback
N>>NIL_33_34Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to6dischargeOut= Nil, avoid Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to Liddell (34 or 33), Feedback
N>9ML_94TCentral-west NSW: Molong–Orange North 132 kV6dischargeOut= 9ML (Mt Piper to Crudine Ridge tee Ilford)l, avoid O/L Molong to Orange North (94T) on trip of Nil, Feedback
N>7M_998_72Central-west NSW: Molong–Orange North 132 kV5chargeOut= Stubbo to Wollar West (7M) 330kV line, avoid O/L on Cowra to Forbes North (998) on trip of Mt Piper to Wellington line (72), Feedback
N>94M_9ML1_NILCrudine Ridge Wind Farm — discretionary cap3dischargeOut= Beryl to Crudine Ridge 132kV line (94M), avoid O/L Crudine Ridge to Ilford Tee (9ML) on trip of Nil,
N>>33_34_QMAX_NBayswater to Liddell (33 or 34) O/L on loss of other Bayswater to3dischargeOut = Bayswater to Liddell(33 or 34), avoid O/L Bayswater to Liddell(33 or 34) on trip of QLD largest generation, Feedback
N>>34+5A5_33_32Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to2dischargeOut= Mt. Piper-Wollar (5A5) and Bayswater to Liddell (33 or 34) line, avoid O/L Bayswater to Liddell (33 or 34) 330kV line on trip of Bayswater to Sydney West (32) 330kV line, Feedback
N>NIL_94BCrudine Ridge to Ilford Tee (9ML)2dischargeOut= Nil, avoid O/L Beryl to Wellington 132 kV (94B/1) on nil trip, Feedback. Metering at Wellington is used
N>945+94M_947_72Molong to Orange North (94T)1chargeOut= Beryl to Crudine Ridge 132kV line (94M) and Molong to Wellington 132kV line (945) , avoid O/L Wellington to Orange North (947) 132kV line on trip of Mt Piper to Wellington (72) 330kV line, Feedback
CA_BRIS_59CD80D1_1Molong to Orange North (94T)1chargeConstraint Automation, O/L 947:L947:I:132@WELLNGTN@NSW for CTG LNQR on trip of WELLNGTN-MT_PIPER 72 330KV LN. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
N>9ML_947_94TCentral-west NSW: Molong–Orange North 132 kV1dischargeOut= 9ML (Mt Piper to Crudine Ridge tee Ilford), avoid O/L Wellington to Orange North (947) on trip of Molong to Orange North (94T), Feedback
N>9ML_94T_947Central-west NSW: Molong–Orange North 132 kV0dischargeOut= 9ML (Mt Piper to Crudine Ridge tee Ilford), avoid O/L Molong to Orange North (94T) on trip of Wellington to Orange North (947) line, Feedback
N_CRWF1_22WT_DAYCrudine Ridge Wind Farm — discretionary cap0dischargeCrudine Ridge Wind Farm turbine limit of 22 during day time. Constraint to violate if Crudine Ridge Wind Farm turbine availability greater than 22 during day time. Swamp out otherwise. DS only.
Showing the 15 constraints with the most hours; 1 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.