NEM Dashboard

ITK
Period

Carwarp Solar Farm

Solar · VIC · CRWARP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
150 MW
Intervals limited
19%
Curtailed while constrained
4.8 GWh
Other curtailment
2.6 GWh
Value of constrained curtailment
$0.1m
Median local price adj.
−534 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V^^V_NIL_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV105dischargeOut= Nil, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line. Murraylink VFRB disabled. Swamp if Murraylink VFRB enabled.
V^^V_6CGH_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV98dischargeOut= 6C, 6G, 6H 330kV lines, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line. Murraylink VFRB disabled. Swamp if Murraylink VFRB enabled
V_CRWARP_FLT_75Carwarp Solar Farm — system strength79dischargeLimit Carwarp solar farm upper limit to 75 MW to manage post contingent voltage oscillation
V_CRWARP_FLT_0Carwarp Solar Farm — system strength48dischargeLimit Carwarp solar farm upper limit to 0 MW to manage post contingent voltage oscillation
VS_HEY_600_TESTNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV36chargeOut = Nil, Vic to SA on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade
V>>BELML_BAML1_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV14dischargeOut= Ballarat to Elaine to Moorabool 220kV line, avoid O/L Ballarat to Moorabool No.1 220kV line for trip of Ballarat to Moorabool No.2 220kV line, Feedback
V^^V_BDBU_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV12dischargeOut = Bundey to Buronga (6F) 330kV line, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line. Murraylink VFRB disabled. Swamp if Murraylink VFRB enabled.
V>>BDBU_ELML_BAML2North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV12dischargeOut = Bundey to Buronga (6F) 330kV line, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>NIL_ELML_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV12dischargeOut= Nil, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>DDGN_GEDD_GNDDNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV9dischargeOut = Glenrowan to Dederang No.1 or No.3 220kV line, avoid O/L Goorambat East to Dederang 220kV line on loss of remaining Glenrowan to Dederang 220kV line, feedback
V>>NIL_MLGT_MLGTVictoria: transient stability, Hazelwood–South Morang 500 kV8dischargeOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
V>>6CGH_BEBA_ARWBBAVictoria: transient stability, Hazelwood–South Morang 500 kV6dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V>>6CGH_ELML_BAML2North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV5dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>NIL_WBBA_KGBENorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV4dischargeOut= Nil, avoid O/L Waubra to Ballarat 220kV line on trip of Kerang to Bendigo 220kV line, Feedback
V_NWVIC_GEN_1100North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV4discharge1100MW upper limit on IBR within North West Victoria (Bendigo-Ballarat-Red Cliffs 220kV area)
Showing the 15 constraints with the most hours; 20 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.