NEM Dashboard

ITK
Period

Dalrymple BESS

Battery · SA · DALNTH1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
30 MW
Intervals discharge-limited
4.7%
Intervals charge-limited
0.2%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−984 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
S>>BWMP_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line42dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>NIL_HUWT_STBGSnowtown - Bungama on loss of Hummocks - Waterloo40dischargeOut = Nil; avoid O/L on Snowtown - Bungama line 132kV on loss of Hummocks - Waterloo 132kV line, Feedback
S>>NIL_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line16dischargeOut= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>NIL_BWMP_RHBR-TRedhill-Brinkworth T10dischargeOut= Nil, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>BWMP_DVBR_RHBG-TManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback
S>>BWMP_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback
S>>BWMP_HUWT_RHBG-TManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill-Brinkworth 132kV T line on trip of Hummocks-Waterloo 132kV line, Feedback
S>>BRTW_BWPA_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_RBTU_WEWTWaterloo East-Waterloo2chargeOut= Nil, avoid O/L Waterloo East-Waterloo 132kV line on trip of one Robertstown-Tungkillo 275kV line, Feedback
S>>NIL_BWMP_WTTPManage voltage collapse in northern SA for the trip of one 275kV line2dischargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback
S_DLBAT-G_ISLDalrymple BESS — unit zero1dischargeOut= Yorke Peninsula 132kV network islanded (i.e. island formed between Hummocks-Androssan West- Dalrymple 132kV network), Dalrymple Battery islanded
S>>CNRB_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>NIL_RBTX_RBTX_1One Robertstown 275/ TX1chargeOut= Nil, avoid O/L of one Robertstown 275/132kV TX on trip of other Robertstown 275/132kV TX, Feedback
S>>CNRB_BWPA_RHBR-TManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>BRDV_RBTU_WEWTWaterloo East-Waterloo0chargeOut= Brinkworth - Davenport 275kV line, avoid O/L Waterloo East-Waterloo 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
Showing the 15 constraints with the most hours; 6 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.