NEM Dashboard

ITK
Period

Dartmouth

Water · VIC · DARTM1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
185 MW
Intervals limited
0.6%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−46 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V::N_NIL_V2Victoria: transient stability, Hazelwood–South Morang 500 kV95chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V^^N_NIL_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV33chargeOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
V::N_LTWG_S2Victoria: transient stability, Hazelwood–South Morang 500 kV21chargeOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, SA accelerates, Yallourn W G1 on 500 kV.
V::N_SETB_V2Victoria: transient stability, Hazelwood–South Morang 500 kV17chargeOut = one South East - Tailembend 275kV line (Black Range series caps I/S), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_NIL_V1Victoria: transient stability, Hazelwood–South Morang 500 kV15chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V::N_KGRC_V1Victoria: transient stability, Hazelwood–South Morang 500 kV11chargeOut = Kerang to Red Cliffs 220kV line (or any section in between), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V^^N_SDUT_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV11chargeOut = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_BADP_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV10chargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_GRYS_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV7chargeOut = Gullen Range to Yass (3J), avoid voltage collapse around Murray for loss of all APD potlines
V::N_LTWG_V2Victoria: transient stability, Hazelwood–South Morang 500 kV7chargeOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates, Yallourn W G1 on 500 kV.
V>>6CGH_BEBA_ARWBBAVictoria: transient stability, Hazelwood–South Morang 500 kV6dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V::N_SMSY_V2Victoria: transient stability, Hazelwood–South Morang 500 kV6chargeOut = South Morang to Sydenham 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_SMSY_O2Victoria: transient stability, Hazelwood–South Morang 500 kV5chargeOut = South Morang to Sydenham 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 500kV.
V::N_ROSM_V2Victoria: transient stability, Hazelwood–South Morang 500 kV4chargeOut = Rowville to South Morang 500kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_NIL_O2Victoria: transient stability, Hazelwood–South Morang 500 kV4chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, Other than VIC accelerates. Yallourn W G1 on 500kV.
Showing the 15 constraints with the most hours; 23 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.