Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
46 MW
Intervals limited
9.0%
Curtailed while constrained
3.3 GWh
Other curtailment
1.8 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−1,000 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V_DUNDWF1_2_3_168Dundonnell Wind Farm — 168 MW cap188dischargeDiscretionary upper limit on Dundonnell WF (1 + 2 + 3) generation of 168 MW
V_SH_DD_MAC_FLT_965Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output24dischargeLimit Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output to 965 MW if Heywood flow is above 500 MW (SA to VIC direction). Swamp otherwise. This is to manage voltage oscillation.
V>>NIL_MLGT_MLGTVictoria: transient stability, Hazelwood–South Morang 500 kV8dischargeOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
V_V_HYAPD1_1Dundonnell Wind Farm — 168 MW cap3dischargeOut = Heywood to Alcoa Portland 500kV No.1 line (HYTS-APD). Limit voltage unbalance at the APD 500 kV bus and Heywood 275 kV bus
V>>6CGH_MLGT_MLGTVictoria: transient stability, Hazelwood–South Morang 500 kV1dischargeOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
V_DUNDWF_56WTDundonnell Wind Farm — 168 MW cap1dischargeDundonnell wind farm turbine limit of 56. Constraint to violate if Dundonnell Wind Farm number of turbine availability greater than 56. Swamp out otherwise. DS only
V>>SMF2_SMF1_NIL_R5The remaining South Morang 500/ F transformer0dischargeOut = South Morang 500/330kV F2 transformer, avoid pre-contingent O/L of the remaining South Morang F1 500/330kV transformer, radial mode, YWPS unit 1 on 500kV, feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.