Glenellen Solar Farm

Solar · NSW · GESF1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
200 MW
Intervals limited
38%
Curtailed while constrained
43.9 GWh
Other curtailment
0.2 GWh
Value of constrained curtailment
$2.1m
Median local price adj.
−1,060 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>>NIL_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV357dischargeOut= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N>>6CGH_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV244dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N^^N_6CGH_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV182dischargeOut=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV178dischargeOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N^^N_NIL_LTWGSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV66chargeOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
V>>N_NIL_65_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV34dischargeOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
N>>BDBU_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV18dischargeOut= Bundey to Buronga (6F) 330kV Line, avoid O/L Jindera to Wodonga (60) 330kV line on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N::N_GRRP_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)4dischargeOut = Gullen Range to Rye Park (3P), stability limit (Snowy-NSW) for loss of Yass-Marulan (4/5) 330kV line
N::N_DTKV_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)2dischargeOut = Dapto - Kangaroo Valley (18) 330kV line, transient stability limit (Snowy-NSW) for loss of one 330kV line between Yass and Bannaby/Marulan with summated flow on 4+5+61 <=1500
N>NIL_9R4_62Mulwala to Corowa (996/2)1chargeOut= NIL, avoid O/L Finley to Mulwala (9R4) 132kV line on trip of Walla Walla to Jindera (62) 330kV line, Feedback
N>>NIL_996_62Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV1chargeOut = Nil, avoid Wagga to ANM (996) 132kV line O/L on Walla Walla to Jindera (62) 330kV line trip; Feedback (Note: constraint swamped when 996 is O/S)
N>>V_6CGH_65_66Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV0chargeOut = 6C, 6G, 6H 330kV lines, avoid Upper Tumut to Murray(65) using 15 mins rating O/L on Lower Tumut to Murray(66) trip; (Note: constraint is swamped out if TL 64 is O/S)
N>>V_DDMS_051_67_NSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV0dischargeOut= Dederang to Murray (67 or 68) 330 kV line, avoid O/L Wagga to Lower Tumut (051) 330kV line on trip of the remaining Dederang to Murray 330kV line, Feedback
Showing the 15 constraints with the most hours; 1 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.