NEM Dashboard

ITK
Period

Gunnedah Solar Farm

Solar · NSW · GNNDHSF1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
110 MW
Intervals limited
25%
Curtailed while constrained
15.2 GWh
Other curtailment
5.8 GWh
Value of constrained curtailment
$0.8m
Median local price adj.
−1,043 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>NIL_969North-west NSW: Gunnedah–Tamworth 132 kV412dischargeOut= Nil, avoid O/L Gunnedah to Tamworth (969) on trip of Nil, Feedback. Metering is used as specified in OM520 [Note: swamped with 96M or 9UJ or 9UH or 9U3/2 is O/S]
N>>NIL_964_84_SNSW mid-north coast: Port Macquarie–Herons Creek 132 kV259dischargeOut= NIL, avoid O/L Port Macquarie to Herons Creek Tee (964/2) on trip of Tamworth to Liddell (84) line, Feedback
N>96M_969_NILNorth-west NSW: Gunnedah–Tamworth 132 kV30dischargeOut= Moree to Narrabri (96M) 132kV line
N>X-968+96M_969_NILNorth-west NSW: Gunnedah–Tamworth 132 kV8dischargeOut= 968 (Tamworth to Narrabri) 132 kV Line and 96M(Narrabri to Moree), avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N>9UH_969_NILNorth-west NSW: Gunnedah–Tamworth 132 kV8dischargeOut= Any one 132kV feeder between Narrabri to Gunnedah Solar Farm (9UH, 9UJ, 9U3/2), avoid O/L Gunnedah to Tamworth (969) 132kV line on trip of Nil, Feedback
N>>NIL_33_34Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to6chargeOut= Nil, avoid Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to Liddell (34 or 33), Feedback
N>>965_9W2_9W8NSW mid-north coast: Port Macquarie–Herons Creek 132 kV6dischargeOut= Armidale to Kempsey (965), avoid O/L Raliegh to Kempsey 132kV line on trip of Coffs Harbour to Boambee (9W8) 132kV line, Feedback
N>>9W7_9W2_965NSW mid-north coast: Port Macquarie–Herons Creek 132 kV5dischargeOut= One of Coffs Harbour to Kempsey (9W5 or 9W6 or 9W7 or 9W8), avoid O/L Raliegh to Kempsey (9W2) 132kV line on trip of Armidale to Kempsey (965) 132kV line, Feedback
N>9U2_969_NILNorth-west NSW: Gunnedah–Tamworth 132 kV4dischargeOut= 9U2 (Moree to Inverell ) 132kV line, avoid O/L on 969 (Gunnedah to Tamworth) 132 kV on Nil trip, Feedback
N>>33_34_QMAX_NBayswater to Liddell (33 or 34) O/L on loss of other Bayswater to3chargeOut = Bayswater to Liddell(33 or 34), avoid O/L Bayswater to Liddell(33 or 34) on trip of QLD largest generation, Feedback
N>>81_964_82NSW mid-north coast: Port Macquarie–Herons Creek 132 kV3dischargeOut = Liddell to Newcastle (81) line, avoid O/L Port Macquarie to Herron Creek Tee (964/2) on trip of Liddell to Tomago (82) line, (Note: Swamps if 964 O/S)
N>>34+5A5_33_32Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to2chargeOut= Mt. Piper-Wollar (5A5) and Bayswater to Liddell (33 or 34) line, avoid O/L Bayswater to Liddell (33 or 34) 330kV line on trip of Bayswater to Sydney West (32) 330kV line, Feedback
N>>81_964_84NSW mid-north coast: Port Macquarie–Herons Creek 132 kV0dischargeOut = Liddell to Newcastle (81) line, avoid O/L Port Macquarie to Herron Creek Tee (964/2) on trip of Liddell to Tamworth (84) line,(Note: Swamps if 964 O/S)
N>>NIL_964_88_SNSW mid-north coast: Port Macquarie–Herons Creek 132 kV0dischargeOut= NIL, avoid O/L Port Macquarie to Herons Creek Tee (964/2) on trip of Tamworth to Muswellbrook (88) line, Feedback
N_GNNDHSF1_0INVNorth-west NSW: Gunnedah–Tamworth 132 kV0dischargeGunnedah Solar Farm inverter limit of zero. Constraint to violate if Gunnedah Solar Farm inverter availability greater than zero. Swamp out otherwise. DS only
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.