NEM Dashboard

ITK
Period

Guthega

Water · NSW · GUTHEGA
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
60 MW
Intervals limited
14%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−72 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V^^N_CNCW_1Out = Canberra-Capital (6) or Kangaroo Valley to Capital (3W), avoid171chargeOut = Canberra-Capital (6) or Kangaroo Valley to Capital (3W), avoid voltage collapse around Murray for loss of all APD potlines
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
V>>N_NIL_65_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV34dischargeOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
V^^N_NIL_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV33chargeOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_SDUT_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV11chargeOut = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_BADP_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV10chargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_GRYS_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV7chargeOut = Gullen Range to Yass (3J), avoid voltage collapse around Murray for loss of all APD potlines
CA_BRIS_59B1EA1C_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV5dischargeConstraint Automation, O/L 65:LSM1:I:330@MURRAY@VIC for CTG LHPA on trip of LTSS-MSS (66) 330KV LINE. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
V>>N_051+X5_65_66Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV5dischargeOut = Lower Tumut to Wagga (051) 330kV line, avoid O/L Murray to Upper Tumut (65) 330kV line on trip of Murray to Lower Tumut (66) 330kV line, Wagga to Yass 132kV network split, X5 or 63 opened, 9R4 opened and 2 Yass transformers in service, Feedback
N::N_GRRP_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)4dischargeOut = Gullen Range to Rye Park (3P), stability limit (Snowy-NSW) for loss of Yass-Marulan (4/5) 330kV line
V^^N_BADP_DTKV_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV3chargeOut = Balranald to Darlington Point (X5) 220kV line and Dapto - Kangaroo Valley (18) 330kV line, avoid voltage collapse around Murray for loss of all APD potlines
N::N_DTKV_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)2dischargeOut = Dapto - Kangaroo Valley (18) 330kV line, transient stability limit (Snowy-NSW) for loss of one 330kV line between Yass and Bannaby/Marulan with summated flow on 4+5+61 <=1500
V^^N_DTMN_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV0chargeOut = Dapto to Marulan (8) 330kV Line, avoid voltage collapse around Murray for loss of all APD potlines
N>>V_6CGH_65_66Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV0chargeOut = 6C, 6G, 6H 330kV lines, avoid Upper Tumut to Murray(65) using 15 mins rating O/L on Lower Tumut to Murray(66) trip; (Note: constraint is swamped out if TL 64 is O/S)
Showing the 15 constraints with the most hours; 2 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.