NEM Dashboard

ITK
Period

Hornsdale Wind Farm Stage 2

Wind · SA · HDWF2
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
102 MW
Intervals limited
6.2%
Curtailed while constrained
0.1 GWh
Other curtailment
0.2 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−11 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
I_6F_SN_150Of 150 MW on Bundey46dischargeDiscretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW)
S>>BWMP_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line42dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S^NIL_SA_NORTHManage voltage collapse in northern SA for the trip of one 275kV line24dischargeOut = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S)
S>>NIL_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line16dischargeOut= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>BWMP_DVBR_RHBG-TManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback
S>>BWMP_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback
S>>BRTW_BWPA_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_BWMP_WTTPManage voltage collapse in northern SA for the trip of one 275kV line2dischargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback
SA_ISLE_STRENGTHManage voltage collapse in northern SA for the trip of one 275kV line1dischargeMaximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
S>>CNRB_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S_DVRB2_270For Hornsdale WF1+ Hornsdale WF2+Hornsdale WF3+Hallet Hill GT + Hornsdale battery (i.e.1dischargeOut = DV-LK 275kV line Or CN-RB 275kV line O/S, discretionary upper limit for Hornsdale WF1+ Hornsdale WF2+Hornsdale WF3+Hallet Hill GT + Hornsdale battery (i.e. generation + load component) <= 270 MW
S>>CNRB_BWPA_RHBR-TManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>BRDV_RBTU_WEWTWaterloo East-Waterloo0dischargeOut= Brinkworth - Davenport 275kV line, avoid O/L Waterloo East-Waterloo 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>>BDBU_RBTU_WEWTOf 150 MW on Bundey0dischargeOut= Bundey to Buronga 330kV, avoid O/L Waterloo East-Waterloo 132kV line on trip of one Robertstown-Tungkillo 275kV line, Feedback
S>>NIL_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback
Showing the 15 constraints with the most hours; 3 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.