Solar · VIC · HREPSF1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
151 MW
Intervals limited
0.2%
Curtailed while constrained
0.0 GWh
Other curtailment
0.1 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−42 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V_NWVIC_GEN_1100North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV4discharge1100MW upper limit on IBR within North West Victoria (Bendigo-Ballarat-Red Cliffs 220kV area)
V>>NIL_ELML_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV1dischargeOut= Nil, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>NIL_WBBA_KMRCWaubra to Ballarat0dischargeOut= Nil, avoid O/L Waubra to Ballarat 220kV line on trip of Kiamal to Carwarp to Red Cliffs 220kV line, Feedback. Constraint active only when GFT2 on Murra Warra WF I/S.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.