Jemalong Solar

Solar · NSW · JEMALNG1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
55 MW
Intervals limited
39%
Curtailed while constrained
6.3 GWh
Other curtailment
0.5 GWh
Value of constrained curtailment
$0.3m
Median local price adj.
−848 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>NIL_94TCentral-west NSW: Molong–Orange North 132 kV390dischargeOut= Nil, avoid O/L Molong to Orange North (94T) on trip of Nil, Feedback
N>NIL_94K_1Central-west NSW: Molong–Orange North 132 kV253dischargeOut= Nil, avoid O/L Suntop Tee to Wellington (94K/1) on trip of Nil, Feedback
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N>NIL_999_9GLCowra to Bango (999)128dischargeOut= Nil, avoid O/L Cowra to Bango (999) 132kV line on trip of Bango to Yass (9GL) 132kV line, Feedback
N>94T_947_72Central-west NSW: Molong–Orange North 132 kV119dischargeOut= Molong to Orange North (94T) 132kV line, avoid O/L Wellington to Orange North (947) 132kV line on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N>NIL_945_947Central-west NSW: Molong–Orange North 132 kV69chargeOut= Nil, avoid O/L Wellington to Wellington Town (945/2) 132kV line on trip of Wellington to Orange North (947) 132kV line, Feedback
N>NIL_94T_72Central-west NSW: Molong–Orange North 132 kV68dischargeOut= Nil, avoid O/L Molong to Orange North (94T) 132kV line on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N>94T_945_94KCentral-west NSW: Molong–Orange North 132 kV61dischargeOut= Molong to Orange North (94T) 132kV line, avoid O/L Molong to Wellington (945/1) on trip of Parkes to Wellington (94K) line, Feedback
N>NIL_94T_947Central-west NSW: Molong–Orange North 132 kV50dischargeOut= Nil, avoid O/L Molong to Orange North (94T) on trip of Wellington to Orange North (947) line, Feedback
N>YSTX_TX_NIL_LVSnowy to NSW: transient stability limits (Yass–Bannaby–Marulan)36dischargeOut= One Yass 330/132kV TX, avoid O/L other Yass 132/330kV transformer on trip of Nil, Feedback
V^^N_NIL_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV33dischargeOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
N>NIL_947_94TCentral-west NSW: Molong–Orange North 132 kV19dischargeOut= Nil, avoid O/L Wellington to Orange North (947) on trip of Molong to Orange North (94T), Feedback
V^^N_SDUT_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV11dischargeOut = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_BADP_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV10dischargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines
Showing the 15 constraints with the most hours; 23 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.