NEM Dashboard

ITK
Period

Kidston Solar Project Phase One 50MW

Solar · QLD · KSP1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
50 MW
Intervals limited
42%
Curtailed while constrained
11.4 GWh
Other curtailment
3.8 GWh
Value of constrained curtailment
$0.7m
Median local price adj.
−997 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
Q>NIL_CPWU_CLWUCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)168dischargeOut= Nil, avoid O/L Calliope River to Wurdong (818) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback. [DS RHS to swamp if 8810+8811 lines O/S]
Q>NIL_CPWU_CLWU_RADCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)154dischargeOut= NIL, Boyne Island Potlines radialised, avoid O/L Calliope River to Wurdong (818) 275kV line on trip of Calvale to Wurdong (871) 275kV line, Feedback.
Q>LCCP_BCCP_CLWUCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)110dischargeOut= Larcom Creek to Calliope River (8859), avoid O/L Bouldercombe to Calliope River (812) on trip of Calvale to Wurdong (871) line, Feedback
Q>NIL_LCCP_BCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)92dischargeOut= Nil, avoid O/L Larcom Creek to Calliope River (8859) 275kV line on trip of Bouldercombe to Calliope River (812) 275kV line, Feedback
Q:NIL_CSCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)64dischargeOut = Nil, CQ-SQ transient stability limit (upper limit of 2100MW)
Q>PWSP_PWSP_WOSPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)63dischargeOut= Palmwoods to South Pine (808) line, avoid O/L on parallel 110kV lines between Palmwoods and South Pine (745/746) on trip of Woolooga to South Pine (807) 275kV line, Feedback
Q>LCCP_CLWU_BCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)50dischargeOut= Larcom Creek to Calliope River (8859), avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q_2+1_R3_KSP1Kidston Solar Project Phase One 50MW — system strength34dischargeLimit Kidston SF to100%,70%,40%,30%,20% ,1% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton/Townsville Syncon, NQLD demand, Ross+FNQ demand, NQLD WAMPAC; Zero if it does not meet the condition
Q_2+BSNE_KSP1Kidston Solar Project Phase One 50MW — system strength31dischargeLimit Kidston SF to 80%, 60%, 40%, 20% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton/Townsville Syncon, NQLD demand, Ross+FNQ demand, NQLD WAMPAC; Zero if it does not meet the condition
Q>NIL_RGLC_BCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)30dischargeOut= Nil, avoid O/L Raglan to Larcom Creek (8875) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q_2+LCCP_KSP1Kidston Solar Project Phase One 50MW — system strength30dischargeLimit Kidston SF to 100%, 80%, 40%, 30%, 20%, 1% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton/Townsville Syncon, NQLD demand, Ross+FNQ demand, NQLD WAMPAC; Zero if it does not meet the condition
Q>CPWO2_CPWU_CPWO1Central Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)29dischargeOut= Calliope River to Woolooga (814) 275kV line Tee Gin Gin, avoid O/L Calliope River to Wurdong (818) 275kV on trip of Calliope River to Woolooga (813) 275kV line, Feedback
Q_A39B_KSP1Kidston Solar Project Phase One 50MW — system strength27dischargeLimit Kidston SF to 80%, 40%, 30%, 20%, 1% dependent on status of Stanwell, Callide B+C, Gladstone, Kareeya, Haughton/Townsville Syncon, NQLD demand, Ross+FNQ demand, NQLD WAMPAC; Zero if it does not meet the condition
Q>X_LCWO_BCCP_CLWUCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)23dischargeOut= 8859 (Larcom Creek - Calliope River) + 814 (Calliope River - Gin Gin - Woolooga) 275kV lines, avoid O/L Bouldercombe to Calliope River (812) on trip of Calvale to Wurdong (871) line, Feedback
Q>NIL_CLWU_CPWU_RADCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)21dischargeOut= NIL, Boyne Island Potlines radialised, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Calliope River to Wurdong (818) 275kV line, Feedback
Showing the 15 constraints with the most hours; 38 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.