Ladbroke Grove

OCGT · SA · LADBROK2
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
40 MW
Intervals limited
1.2%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−16 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
I_6F_SN_150Of 150 MW on Bundey46chargeDiscretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW)
V::S_SETB_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage9dischargeOut= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines.
S>V_NIL_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage7dischargeOut= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
V::S_BLKRG_MAXG_3Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage5dischargeOut = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA.
S>>NIL_TUTB_TUTB_1Tungkillo-Tailem Bend 1 or 24chargeOut= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback
S::V_NIL_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage3chargeOut = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>KHKN_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage2dischargeOut= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
CA_SYDS_59E0BEF5_1Tungkillo-Tailem Bend 1 or 22chargeConstraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD)
S::V_TBSE_TBSEVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage2chargeOut = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines.
SA_SETB_BVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage1chargeOut = South East to Tailem Bend 275 kV line, SA Islanded for loss of parallel line by SAIT RAS scheme, limit contingency at VIC-SA separation point to < 250 MW in SA to VIC direction
V::S_PWSE_MAXGVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage1dischargeOut= Penola West - South East 132 kV line (Both Black Range series caps I/S); Vic to SA Transient Stability limit for loss of the largest generator in SA.
V::S_BLKRG_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage1dischargeOut = both or one Black Range series capacitors O/S; Vic to SA Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>PWSE_TBTX4_TBMOUpper limit on Tailem Solar Farm 1+ Tailem Solar farm 2 + Tailem Bend1dischargeOut= Penola West - South East #1 132KV line (Both Black Range series caps I/S); avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 275/132kV #4 transformer, Feedback
S>>BDBU_TBTU_TBTU_1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage1dischargeOut= Bundey to Buronga 330kV, avoid O/L Tailem Bend-Tungkillo 275kV line 1 or 2 on trip of parallel Tailem Bend-Tungkillo 275 kV line 2 or 1, Feedback
S>>NIL_TBTX4_TBMO_1Upper limit on Tailem Solar Farm 1+ Tailem Solar farm 2 + Tailem Bend0dischargeOut= Nil, avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 275/132kV (#4) transformer, Feedback
Showing the 15 constraints with the most hours; 1 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:56; data through 25 Nov 2026 01:55 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.