| I_6F_SN_150 | Of 150 MW on Bundey | 46 | charge | Discretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW) |
| SV_250_LKB_DYN | Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength | 14 | charge | SA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Limit dynamically reduced when actual flow exceeds limit by at least 10 MW. Limit reduced by amount of exceedance, capped at 25 MW. Constraint swamped if trip scheme O/S |
| V::S_SETB_TBSE_2 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 9 | discharge | Out= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines. |
| S>V_NIL_SETX_SETX1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 7 | discharge | Out= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| V::S_BLKRG_MAXG_3 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 5 | discharge | Out = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA. |
| S>>NIL_TUTB_TUTB_1 | Tungkillo-Tailem Bend 1 or 2 | 4 | charge | Out= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback |
| SV_HEY_600_TEST | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 4 | discharge | Out = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade |
| V::S_BDBU_MAXG_1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 3 | discharge | Out = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available). |
| S_ISLE_LKB1+2+3_60 | Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength | 3 | discharge | Discretionary upper limit on Lake Bonney (1+2+3) windfarms<=60 MW & No. in-service wind turbines for LKB at 41 Turbines.(Note otherwise, LKB 2+3 +1 will be constrained to 0 MW) (Note: swamped when Lake Bonney Tripping scheme is I/S) |
| V_VS_LB_HY_250 | Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength | 3 | discharge | Limiting V-SA + Lake Bonney WF <= 250 MW when SA is at risk of separation. Constraint swamp out when Lake Bonney tripping scheme is O/S |
| S::V_NIL_TBSE_2 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 3 | charge | Out = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines. |
| S>KHKN_SETX_SETX1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 2 | discharge | Out= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback |
| CA_SYDS_59E0BEF5_1 | Tungkillo-Tailem Bend 1 or 2 | 2 | charge | Constraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD) |
| SV_250_LKB | Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength | 2 | charge | SA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Constraint swamped if trip scheme O/S |
| S::V_TBSE_TBSE | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 2 | charge | Out = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines. |