NEM Dashboard

ITK
Period

Lake Bonney 1 Wind Farm

Wind · SA · LKBONNY1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
80 MW
Intervals limited
1.9%
Curtailed while constrained
0.3 GWh
Other curtailment
12.1 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−17 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
I_6F_SN_150Of 150 MW on Bundey46chargeDiscretionary limit of 150 MW on Bundey to Buronga (6F) 330 kV Line (SA to NSW)
SV_250_LKB_DYNLake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength14chargeSA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Limit dynamically reduced when actual flow exceeds limit by at least 10 MW. Limit reduced by amount of exceedance, capped at 25 MW. Constraint swamped if trip scheme O/S
V::S_SETB_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage9dischargeOut= one South East to Tailem Bend 275kV line (Both Black Range series capacitors O/S or I/S); Vic to SA Transient Stability limit for loss of one of the Tailem Bend-South East 275kV lines.
S>V_NIL_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage7dischargeOut= Nil, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
V::S_BLKRG_MAXG_3Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage5dischargeOut = only one Black Range series capacitor I/S; Vic to SA Transient Stability limit for loss of the largest generation block in SA.
S>>NIL_TUTB_TUTB_1Tungkillo-Tailem Bend 1 or 24chargeOut= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback
SV_HEY_600_TESTVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage4dischargeOut = Nil, SA to Vic on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade
V::S_BDBU_MAXG_1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage3dischargeOut = Bundey to Buronga 330kV(Both Black Range series capacitors I/S); Vic to SA Transient Stability limit for loss of the largest generation block in SA (Both South East Capacitor Available).
S_ISLE_LKB1+2+3_60Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength3dischargeDiscretionary upper limit on Lake Bonney (1+2+3) windfarms<=60 MW & No. in-service wind turbines for LKB at 41 Turbines.(Note otherwise, LKB 2+3 +1 will be constrained to 0 MW) (Note: swamped when Lake Bonney Tripping scheme is I/S)
V_VS_LB_HY_250Lake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength3dischargeLimiting V-SA + Lake Bonney WF <= 250 MW when SA is at risk of separation. Constraint swamp out when Lake Bonney tripping scheme is O/S
S::V_NIL_TBSE_2Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage3chargeOut = Nil(Note: with both Black Range series capacitors O/S); SA to VIC Transient Stability limit for loss of one of the Tailembend-South East 275kV lines.
S>KHKN_SETX_SETX1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage2dischargeOut= Keith-Kincraig 132kV line, avoid overloading a South East 132/275 kV transformer on trip of the remaining South East 132/275 kV transformer(for Transformer component SECS O/S), Feedback
CA_SYDS_59E0BEF5_1Tungkillo-Tailem Bend 1 or 22chargeConstraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD)
SV_250_LKBLake Bonney 1 Wind Farm + Lake Bonney 2 Wind Farm + Lake Bonney 3 Wind Farm — system strength2chargeSA to VIC upper contingency limit of 250 MW, considering Lake Bonney WF trip scheme. Constraint swamped if trip scheme O/S
S::V_TBSE_TBSEVictoria to SA: transient stability, South East–Tailem Bend 275 kV outage2chargeOut = one Tailem Bend-South East 275kV line (Note: with one Black Range series caps I/S); SA to VIC Transient Stability limit for loss of other Tailem Bend-South East 275kV lines.
Showing the 15 constraints with the most hours; 10 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.