| S>>BWMP_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 42 | charge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>NIL_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 16 | charge | Out= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>NIL_TUTB_TUTB_1 | Tungkillo-Tailem Bend 1 or 2 | 4 | charge | Out= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback |
| S>>BWMP_BRTW_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | charge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback |
| S-MAPS2-PV_0 | Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) — unit zero | 3 | discharge | Discretionary upper limit for SA WATER Mannum Adelaide Pumping Station No 2 PV (Palmer) generation of 0 MW |
| S>>BRTW_BWPA_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 3 | charge | Out= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback |
| CA_SYDS_59E0BEF5_1 | Tungkillo-Tailem Bend 1 or 2 | 2 | charge | Constraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD) |
| S>>NIL_BWMP_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 2 | charge | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback |
| SA_ISLE_STRENGTH | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | discharge | Maximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV). |
| S>>CNRB_TWPA_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 1 | charge | Out= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback |
| S>>BDBU_TBTU_TBTU_1 | Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage | 1 | discharge | Out= Bundey to Buronga 330kV, avoid O/L Tailem Bend-Tungkillo 275kV line 1 or 2 on trip of parallel Tailem Bend-Tungkillo 275 kV line 2 or 1, Feedback |
| S>>NIL_BRTW_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 0 | charge | Out= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback |
| S>>BWMP_RBTU_WTTP | Manage voltage collapse in northern SA for the trip of one 275kV line | 0 | charge | Out= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback |
| S>>PATW_RBTU_TPRS | Manage voltage collapse in northern SA for the trip of one 275kV line | 0 | charge | Out= Para-Templers West 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback |