NEM Dashboard

ITK
Period

Murray Bridge - Onkaparinga Pipeline Pump 2

Solar · SA · MBPS2PV1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
14 MW
Intervals limited
0.1%
Curtailed while constrained
0.0 GWh
Other curtailment
2.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−45 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
S>>NIL_TUTB_TUTB_1Tungkillo-Tailem Bend 1 or 24chargeOut= NIL, avoid O/L Tungkillo-Tailem Bend 275kV line 1 or 2 on trip of parallel Tungkillo-Tailem Bend 275 kV line 2 or 1, Feedback
CA_SYDS_59E0BEF5_1Tungkillo-Tailem Bend 1 or 22chargeConstraint Automation, O/L TUNTAB_1:LTB2:I:275@TUNKIL@SA for CTG LSIP on trip of TUNKIL - T_BEND #2 275KV LINE. Generated by STNET[BNECR3] Host NORREGEEMP8(EMPSYD)
SA_ISLE_STRENGTHManage voltage collapse in northern SA for the trip of one 275kV line1dischargeMaximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
S>>BDBU_TBTU_TBTU_1Victoria to SA: transient stability, South East–Tailem Bend 275 kV outage1dischargeOut= Bundey to Buronga 330kV, avoid O/L Tailem Bend-Tungkillo 275kV line 1 or 2 on trip of parallel Tailem Bend-Tungkillo 275 kV line 2 or 1, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.