Mortlake Battery inverter limit of zero. Constraint to violate if Mortlake Battery as a generator and inverter availability greater than zero. Swamp out otherwise. DS only
Mortlake Battery inverter limit of zero. Constraint to violate if Mortlake Battery as a load and inverter availability greater than zero. Swamp out otherwise. DS only
Out = South Morang 500/330kV F2 transformer, avoid pre-contingent O/L of the remaining South Morang F1 500/330kV transformer, radial mode, YWPS unit 1 on 500kV, feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.