Mulwala Solar Farm

Solar · NSW · MULWASF1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
31 MW
Intervals limited
36%
Curtailed while constrained
3.9 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.2m
Median local price adj.
−1,048 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>>NIL_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV357dischargeOut= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N>>6CGH_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV244dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N^^N_6CGH_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV182dischargeOut=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV178dischargeOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N>NIL_MLTX_LVMulwala 1 or 2 22/ transformer76dischargeOut= Nil, avoid O/L Mulwala #1 or #2 22/132kV transformer on trip of Nil, Feedback. 90% of Rating is used as operating margin.
N^^N_NIL_LTWGSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV66chargeOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N>YSTX_TX_NIL_LVSnowy to NSW: transient stability limits (Yass–Bannaby–Marulan)36dischargeOut= One Yass 330/132kV TX, avoid O/L other Yass 132/330kV transformer on trip of Nil, Feedback
V>>N_NIL_65_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV34dischargeOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
N>NIL_997/2_99AMulwala to Corowa (996/2)32dischargeOut= NIL, avoid O/L Mulwala to Corowa (996/2) 132kV line on trip of Finley to Uranquinty (99A) 132kV line, Feedback
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)26dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
CA_BRIS_59B1EA1C_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV5dischargeConstraint Automation, O/L 65:LSM1:I:330@MURRAY@VIC for CTG LHPA on trip of LTSS-MSS (66) 330KV LINE. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
N>NIL_YSTX_LVSnowy to NSW: transient stability limits (Yass–Bannaby–Marulan)5dischargeOut= Nil, avoid O/L Either of Yass 132/330 Transformers on trip of Nil, Feedback
N>NIL_997/2_3GMulwala to Corowa (996/2)4dischargeOut= Nil, avoid O/L Mulwala to Corowa (997/2) 132kV line on trip of Wagga to Culcairn (3G) 330kV line, Feedback
N_MULWASF1_ZEROMulwala 1 or 2 22/ transformer4dischargeMulwala Solar Farm upper limit of 0 MW
Showing the 15 constraints with the most hours; 8 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.