| N>>NIL_060_051 | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 357 | discharge | Out= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback |
| N>>6CGH_060_051 | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 244 | discharge | Out= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback |
| N^^N_6CGH_WGLT | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 182 | discharge | Out=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| N^^N_NIL_WGLT | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 178 | discharge | Out=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| N::N_CNCW_2 | Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan) | 145 | discharge | Out = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan |
| N>NIL_MLTX_LV | Mulwala 1 or 2 22/ transformer | 76 | discharge | Out= Nil, avoid O/L Mulwala #1 or #2 22/132kV transformer on trip of Nil, Feedback. 90% of Rating is used as operating margin. |
| N^^N_NIL_LTWG | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 66 | charge | Out=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback |
| N>YSTX_TX_NIL_LV | Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan) | 36 | discharge | Out= One Yass 330/132kV TX, avoid O/L other Yass 132/330kV transformer on trip of Nil, Feedback |
| V>>N_NIL_65_051 | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 34 | discharge | Out = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback |
| N>NIL_997/2_99A | Mulwala to Corowa (996/2) | 32 | discharge | Out= NIL, avoid O/L Mulwala to Corowa (996/2) 132kV line on trip of Finley to Uranquinty (99A) 132kV line, Feedback |
| N::N_SDUT_2 | Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan) | 26 | discharge | Out = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area |
| CA_BRIS_59B1EA1C_1 | Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV | 5 | discharge | Constraint Automation, O/L 65:LSM1:I:330@MURRAY@VIC for CTG LHPA on trip of LTSS-MSS (66) 330KV LINE. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI) |
| N>NIL_YSTX_LV | Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan) | 5 | discharge | Out= Nil, avoid O/L Either of Yass 132/330 Transformers on trip of Nil, Feedback |
| N>NIL_997/2_3G | Mulwala to Corowa (996/2) | 4 | discharge | Out= Nil, avoid O/L Mulwala to Corowa (997/2) 132kV line on trip of Wagga to Culcairn (3G) 330kV line, Feedback |
| N_MULWASF1_ZERO | Mulwala 1 or 2 22/ transformer | 4 | discharge | Mulwala Solar Farm upper limit of 0 MW |