Murray 1

Water · VIC · MURRAY
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
1,550 MW
Intervals limited
10%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−14 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N^^N_6CGH_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV182chargeOut=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV178chargeOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
V::N_NIL_V2Victoria: transient stability, Hazelwood–South Morang 500 kV95chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
N^^N_NIL_LTWGSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV66dischargeOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^V_CNCW_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink49dischargeOut = Canberra-Capital (6) or Kangaroo Valley to Capital (3W) or Dapto-Kangaroo Valley (18), avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_NIL_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink41dischargeOut = Nil, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
V^^N_NIL_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV33chargeOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
V::N_LTWG_S2Victoria: transient stability, Hazelwood–South Morang 500 kV21chargeOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, SA accelerates, Yallourn W G1 on 500 kV.
N^^V_MLNK_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink19dischargeOut = Murraylink, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
V::N_SETB_V2Victoria: transient stability, Hazelwood–South Morang 500 kV17chargeOut = one South East - Tailembend 275kV line (Black Range series caps I/S), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
V::N_NIL_V1Victoria: transient stability, Hazelwood–South Morang 500 kV15chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V::N_KGRC_V1Victoria: transient stability, Hazelwood–South Morang 500 kV11chargeOut = Kerang to Red Cliffs 220kV line (or any section in between), prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 220kV.
V^^N_SDUT_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV11chargeOut = Stockdill to Upper Tumut (1) line, avoid voltage collapse around Murray for loss of all APD potlines
V^^N_BADP_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV10chargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse around Murray for loss of all APD potlines
N^^V_BADP_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink10dischargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
Showing the 15 constraints with the most hours; 45 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:26; data through 25 Nov 2026 01:25 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.