NEM Dashboard

ITK
Period

Murra Warra Wind Farm - stage 2

Wind · VIC · MUWAWF2
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
209 MW
Intervals limited
37%
Curtailed while constrained
30.4 GWh
Other curtailment
9.2 GWh
Value of constrained curtailment
$0.3m
Median local price adj.
−328 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>>6CGH_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV244dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N>>NIL_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV151dischargeOut= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
V^^V_NIL_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV105dischargeOut= Nil, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line. Murraylink VFRB disabled. Swamp if Murraylink VFRB enabled.
V_NWVIC_GFT1_750North-west Victoria wind farms: combined output limit98dischargeLimit total output of Ararat, Crowlands, Bulgana (including BESS), Murra Warra 1 & 2 and Waubra wind farms to 750 MW
V^^V_6CGH_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV98dischargeOut= 6C, 6G, 6H 330kV lines, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line. Murraylink VFRB disabled. Swamp if Murraylink VFRB enabled
V::N_NIL_V2Victoria: transient stability, Hazelwood–South Morang 500 kV95chargeOut = NIL, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, VIC accelerates. Yallourn W G1 on 500kV.
N^^N_NIL_LTWGSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV66chargeOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
V_MURRAWRWF_FLT_200Murra Warra Wind Farm — system strength65dischargeLimit Murra Warra Wind Farm 1+2 upper limit to 200 MW to manage system stability on the next contingency due to voltage oscillation
V^^V_MLNK_KGTSNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV64dischargeOut= Murraylink, avoid voltage collapse for loss of Horsham - Murra Warra - Kiamal 220kV line
N^^N_NIL_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV50dischargeOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
VS_HEY_600_TESTNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV36chargeOut = Nil, Vic to SA on Heywood limit of 600 MW, limit for testing of Heywood interconnection upgrade
V_MURRAWRWF_FLT_15Murra Warra Wind Farm — system strength32dischargeLimit Murra Warra Wind Farm 1+2 upper limit to 15 MW to manage system stability on the next contingency due to voltage oscillation
I_6F_NS_150North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV28dischargeDiscretionary limit of 150 MW on Buronga to Bundey (6F) 330 kV Line (NSW to SA)
V::N_LTWG_S2Victoria: transient stability, Hazelwood–South Morang 500 kV21chargeOut = Lower Tumut to Wagga 330kV line, prevent transient instability for fault and trip of a HWTS-SMTS 500 kV line, SA accelerates, Yallourn W G1 on 500 kV.
N>>BDBU_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV18dischargeOut= Bundey to Buronga (6F) 330kV Line, avoid O/L Jindera to Wodonga (60) 330kV line on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
Showing the 15 constraints with the most hours; 58 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.