NEM Dashboard

ITK
Period

Pine Lodge BESS

Battery · VIC · PLBESS1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
250 MW
Intervals discharge-limited
3.6%
Intervals charge-limited
0.0%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−67 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
V>>BELML_BAML1_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV14dischargeOut= Ballarat to Elaine to Moorabool 220kV line, avoid O/L Ballarat to Moorabool No.1 220kV line for trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>BDBU_ELML_BAML2North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV12dischargeOut = Bundey to Buronga (6F) 330kV line, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>NIL_ELML_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV12dischargeOut= Nil, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>DDGN_GEDD_GNDDNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV9dischargeOut = Glenrowan to Dederang No.1 or No.3 220kV line, avoid O/L Goorambat East to Dederang 220kV line on loss of remaining Glenrowan to Dederang 220kV line, feedback
V>>NIL_MLGT_MLGTVictoria: transient stability, Hazelwood–South Morang 500 kV8dischargeOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
V>>6CGH_BEBA_ARWBBAVictoria: transient stability, Hazelwood–South Morang 500 kV6dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V>>6CGH_ELML_BAML2North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV5dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>BAML1_ELML_BAML2Victoria: transient stability, Hazelwood–South Morang 500 kV4dischargeOut= Ballarat to Moorabool No.1 220kV line, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
V>>DDSM_BEBA_DDSMMount Beauty to Dederang (flow to North) for trip of the parallel2dischargeOut= Dederang to South Morang 330kV line, avoid O/L Bendigo to Ballarat 220kV line on trip of the remaining Dederang to South Morang 330kV line, Feedback
V>>DDSM_MBEP_DDSMNorth-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV2dischargeOut= Dederang to South Morang 330 kV line, avoid O/L either Mount Beauty to Eildon 220 kV line on trip of remaining Dederang to South Morang 330 kV line, Feedback
V>>NIL_BEBA_ARWBBAVictoria: transient stability, Hazelwood–South Morang 500 kV2dischargeOut= Nil, avoid O/L Bendigo to Ballarat 220kV line on trip of Ararat to Waubra to Ballarat 220kV line, Feedback
V>>MLTG_ELML_BAML2North-west Victoria: voltage stability, Horsham–Murra Warra–Kiamal 220 kV2dischargeOut= Moorabool to Terang 220kV line, avoid O/L Elaine to Moorabool 220kV line on trip of Ballarat to Moorabool No.2 220kV line, Feedback
C_V_PLBESS1_061_GCommissioning / hold point constraint for Pine Lodge BESS of 61 MW2dischargeCommissioning / hold point constraint for Pine Lodge BESS of 61 MW - HP1
V>>DDTX3_DDT2_DD1_LHMount Beauty to Dederang (flow to North) for trip of the parallel1dischargeOut= Dederang H3 txfmr, avoid O/L Dederang H2 220/330kV txfmr on trip of Dederang H1 220/330kV txfmr, Feedback
V>>6CGH_MLGT_MLGTVictoria: transient stability, Hazelwood–South Morang 500 kV1dischargeOut = NIL, avoid O/L Moorabool to Geelong #1 or #2 on trip of other Moorabool to Geelong line, Feedback
Showing the 15 constraints with the most hours; 2 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.