NEM Dashboard

ITK
Period

Port Lincoln GT

OCGT · SA · POR01
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
50 MW
Intervals limited
3.0%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−83 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
S>>BWMP_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line42dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>NIL_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line16dischargeOut= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>BWMP_DVBR_RHBG-TManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill- Brinkworth 132kV T line on trip of Davenport-Brinkworth 275kV line, Feedback
S>>BWMP_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback
S>>BWMP_HUWT_RHBG-TManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Redhill-Brinkworth 132kV T line on trip of Hummocks-Waterloo 132kV line, Feedback
S>>BRTW_BWPA_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3dischargeOut= Brinkworth- Templers West 275kV line, avoid O/L Waterloo-Templers 132kV on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_BWMP_WTTPManage voltage collapse in northern SA for the trip of one 275kV line2dischargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback
S_DVCL_270Out=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV1dischargeOut=Davenport-Corraberra Hill 275kV line OR Davenport-Cultana 275 kV line 2, discretionary upper limit for Cathedral Rocks WF + Mount Millar WF + Lincoln Gap WF+ Lincoln Gap Battery+ Pt Lincoln GTs <= 270 MW
S>>CNRB_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>CNRB_BWPA_RHBR-TManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>NIL_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback
S>HUWT_BWPA_RHBR-TManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Hummocks-Waterloo 132kV line, avoid O/L Redhill-Brinkworth T 132kV line on trip of Blyth West-Munno Para 275kV line, Feedback
S>>BWMP_RBTU_WTTPManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>>PATW_RBTU_TPRSManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Para-Templers West 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>BRDV_BWPA_RHBRManage voltage collapse in northern SA for the trip of one 275kV line0dischargeOut= Brinkworth - Davenport 275kV line, avoid O/L Redhill tee - Brinkworth 132kV on trip of Blyth West-Munno Para 275kV line, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.