Limit Stockyard Hill, Dundonnell, Macarthur, Hawkesdale, and Ryan Corner wind farm total output to 965 MW if Heywood flow is above 500 MW (SA to VIC direction). Swamp otherwise. This is to manage voltage oscillation.
Stockyard Hill wind farm turbine limit of 104. Constraint to violate if Stockyard Hill Wind Farm number of turbine availability greater than 104. Swamp out otherwise. DS only
Out = South Morang 500/330kV F2 transformer, avoid pre-contingent O/L of the remaining South Morang F1 500/330kV transformer, radial mode, YWPS unit 1 on 500kV, feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.