Stubbo Solar Farm

Solar · NSW · STUBSF1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
202 MW
Intervals limited
7.0%
Curtailed while constrained
0.6 GWh
Other curtailment
0.4 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−451 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>94T_947_72Central-west NSW: Molong–Orange North 132 kV119dischargeOut= Molong to Orange North (94T) 132kV line, avoid O/L Wellington to Orange North (947) 132kV line on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N>NIL_75_WOTX_72Central-west NSW: Molong–Orange North 132 kV8dischargeOut= Nil, avoid O/L Wollar West - Wollar (75) 330kV line or Wollar 330/500kV transformer on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N>>NIL_33_34Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to6dischargeOut= Nil, avoid Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to Liddell (34 or 33), Feedback
N>72_94T_75Molong to Orange North (94T)5dischargeOut = Mt Piper to Wellington line (72), avoid O/L Molong to Orange North (94T) on trip of Wollar West to Wollar (75) line, Feedback
N>>33_34_QMAX_NBayswater to Liddell (33 or 34) O/L on loss of other Bayswater to2dischargeOut = Bayswater to Liddell(33 or 34), avoid O/L Bayswater to Liddell(33 or 34) on trip of QLD largest generation, Feedback
N_STUBSF_77INVStubbo Solar Farm — system strength2dischargeStubbo Solar Farm 1+2 inverter limit of 77. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 77. Swamp out otherwise. DS only
N>>34+5A5_33_32Bayswater to Liddell (33 or 34) O/L on loss of other Bayswater to2dischargeOut= Mt. Piper-Wollar (5A5) and Bayswater to Liddell (33 or 34) line, avoid O/L Bayswater to Liddell (33 or 34) 330kV line on trip of Bayswater to Sydney West (32) 330kV line, Feedback
N_STUBSF_29INVStubbo Solar Farm — system strength1dischargeStubbo Solar Farm 1+2 inverter limit of 29. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 29. Swamp out otherwise. DS only
N>945+94M_947_72Molong to Orange North (94T)1dischargeOut= Beryl to Crudine Ridge 132kV line (94M) and Molong to Wellington 132kV line (945) , avoid O/L Wellington to Orange North (947) 132kV line on trip of Mt Piper to Wellington (72) 330kV line, Feedback
CA_BRIS_59CD80D1_1Molong to Orange North (94T)1dischargeConstraint Automation, O/L 947:L947:I:132@WELLNGTN@NSW for CTG LNQR on trip of WELLNGTN-MT_PIPER 72 330KV LN. Generated by STNET[NORCR1] Host BNEREGEEMP5(EMPBRI)
N>>945_947_72Molong to Orange North (94T)1dischargeOut= Wellington to Molong 132kV line (945), avoid O/L Wellington to Orange North (947) 132kV line on trip of Wellington to Mt Piper (72) 330kV line, Feedback
N_STUBSF_76INVStubbo Solar Farm — system strength1dischargeStubbo Solar Farm 1+2 inverter limit of 76. Constraint to violate if Stubbo Solar Farm has inverter availability greater than 76. Swamp out otherwise. DS only
N>9ML_947_94TCentral-west NSW: Molong–Orange North 132 kV1dischargeOut= 9ML (Mt Piper to Crudine Ridge tee Ilford), avoid O/L Wellington to Orange North (947) on trip of Molong to Orange North (94T), Feedback
N_STUBSF_0INVStubbo Solar Farm — system strength0dischargeStubbo Solar Farm 1+2 inverter limit of zero. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than zero. Swamp out otherwise. DS only
N_STUBSF_185INVStubbo Solar Farm — system strength0dischargeStubbo Solar Farm 1+2 inverter limit of 185. Constraint to violate if Stubbo Solar Farm 1+2 inverter availability greater than 185. Swamp out otherwise. DS only
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.