Maximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
Out= Penola West - South East #1 132KV line (Both Black Range series caps I/S); avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 275/132kV #4 transformer, Feedback
Out= Tailem Bend 132 kV CB6125, avoid O/L Tailem Bend to Mobilong #1 132kV line on trip of Tailem Bend 132/275kV #4 transformer and Tailem Bend to Keith #2 132kV line, Feedback
Out= Angas Creek-Mannum 132 kV line, manage voltage collapse between Mobilong - Mt Barker for loss of Tailem Bend 275/132 kV 4 transformer.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.