Templers BESS

Battery · SA · TEMPB1
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
111 MW
Intervals discharge-limited
3.8%
Intervals charge-limited
0.9%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−158 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
S>>BWMP_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line42dischargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S^NIL_SA_NORTHManage voltage collapse in northern SA for the trip of one 275kV line24dischargeOut = NIL, Manage voltage collapse in northern SA for the trip of one 275kV line between Davenport-Para or Davenport-Tungkillo.(Note: for both DV + RB Syn Cons are I/S, OR one DV Syn Con O/S, OR one RB Syn Con O/S, OR one DV +RB Syn Con O/S)
S>>NIL_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line16dischargeOut= NIL, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>NIL_TPWTX_TPDRTemplers to Dorrien13chargeOut= NIL, avoid O/L Templers to Dorrien 132kV line on trip of Templers West 132/275kV transformer, Feedback
S>>BWMP_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line3chargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Brinkworth-Templers West 275kV line, Feedback
S>>NIL_RBTU_WEWTWaterloo East-Waterloo2chargeOut= Nil, avoid O/L Waterloo East-Waterloo 132kV line on trip of one Robertstown-Tungkillo 275kV line, Feedback
S>>NIL_BWMP_WTTPManage voltage collapse in northern SA for the trip of one 275kV line2chargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Blyth West- Munno Para 275kV line, Feedback
SA_ISLE_STRENGTHManage voltage collapse in northern SA for the trip of one 275kV line1dischargeMaximum limit (1900 MW) for SA non-synchronous generation for system strength requirements when SA is at risk of separation or when islanded (NOTE: This limit applies when 2-4 syn cons are I/S at RB and DV).
S>>CNRB_TWPA_TPRSManage voltage collapse in northern SA for the trip of one 275kV line1dischargeOut= Canowie-Robertstown 275kV line, avoid O/L Templers-Roseworthy 132kV line on trip of Templers West-Para 275kV line, Feedback
S>>BRDV_RBTU_WEWTWaterloo East-Waterloo0chargeOut= Brinkworth - Davenport 275kV line, avoid O/L Waterloo East-Waterloo 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
S>>NIL_BRTW_WTTPManage voltage collapse in northern SA for the trip of one 275kV line0chargeOut= Nil, avoid O/L Waterloo - Templers 132kV on trip of Brinkworth - Templers West 275kV line, Feedback
S>>BWMP_RBTU_WTTPManage voltage collapse in northern SA for the trip of one 275kV line0chargeOut= Blyth West- Munno Para 275kV line with Blyth West CB8002 OPEN, avoid O/L Waterloo-Templers 132kV line on trip of Robertstown-Tungkillo 275kV line 1 or 2, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.