NEM Dashboard

ITK
Period

Upper Tumut

Water · NSW · UPPTUMUT
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
616 MW
Intervals limited
12%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−74 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N^^V_CNCW_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink49chargeOut = Canberra-Capital (6) or Kangaroo Valley to Capital (3W) or Dapto-Kangaroo Valley (18), avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_NIL_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink41chargeOut = Nil, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
V>>N_NIL_65_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV34chargeOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
N^^V_MLNK_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink19chargeOut = Murraylink, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_BADP_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink10chargeOut = Balranald to Darlington Point (X5) 220kV line, avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_MLNK_ARWBBASouthern NSW: voltage stability for loss of the largest Victorian unit or Basslink7chargeOut = Murraylink, avoid voltage collapse in southern NSW for loss of Ballarat to Waubra to Ararat 220kV lines (this also trips Waubra, Ararat and Crowlands, Bulgana and Murra Warra WFs)
N^^V_NIL_ARWBBASouthern NSW: voltage stability for loss of the largest Victorian unit or Basslink5chargeOut = Nil, avoid voltage collapse in southern NSW for loss of Ballarat to Waubra to Ararat 220kV lines (this also trips Waubra, Ararat and Crowlands, Bulgana and Murra Warra WFs)
N::N_GRRP_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)4dischargeOut = Gullen Range to Rye Park (3P), stability limit (Snowy-NSW) for loss of Yass-Marulan (4/5) 330kV line
N^^V_JNWG_63_X5_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink4chargeOut = Jindera to Wagga(62) 330kV line, 63 + X5 open, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N::N_DTKV_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)2dischargeOut = Dapto - Kangaroo Valley (18) 330kV line, transient stability limit (Snowy-NSW) for loss of one 330kV line between Yass and Bannaby/Marulan with summated flow on 4+5+61 <=1500
N^^V_DDSM1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink1chargeOut = Dederang to South Morang 330 kV line, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink or the parallel Dederang to South Morang 330kV line
N^^V_6+DDSM_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink1chargeOut = Canberra - Capital (6) 330kV line and Dederang - South Morang 330kV line, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N^^V_DPWG_X5_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink0chargeOut = Darlington Point to Wagga(63) and Darlington Point to Balranald (X5) off loaded, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
Showing the 15 constraints with the most hours; 1 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.