NEM Dashboard

ITK
Period

Uranquinty

OCGT · NSW · URANQ14
Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
173 MW
Intervals limited
41%
Curtailed while constrained
0.0 GWh
Other curtailment
0.0 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−1,019 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
N>>NIL_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV357dischargeOut= Nil, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N>>6CGH_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV244dischargeOut= 6C, 6G, 6H 330kV lines, avoid O/L Jindera to Wodonga (60) 330kV line using 15 mins rating on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
N^^N_6CGH_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV182dischargeOut=Nil, limit Wagga to Lower Tumut (51) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N^^N_NIL_WGLTSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV178dischargeOut=Nil, limit Wagga to Lower Tumut (051) 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N::N_CNCW_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)145dischargeOut = Canberra-Capital (6) line, stability limit (Snowy-NSW) for critical fault of one 330kV line between Yass and Bannaby/Marulan
N::N_SDUT_2Snowy to NSW: transient stability limits (Yass–Bannaby–Marulan)111dischargeOut = Upper Tumut-Stockdill (1) 330kV line, stability limit (Snowy-NSW) for fault of various location between Yass-South Morang area
N^^N_NIL_LTWGSouthern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV66chargeOut=Nil, limit Lower Tumut to Wagga 330kV line flow to avoid voltage collapse post contingency trip of line 51, Feedback
N>NIL_99FNarrandera to Uranquinty (99F)59chargeOut= Nil, avoid O/L Narrandera to Uranquinty (99F) 132 kV line on trip of Nil, Feedback
N^^V_CNCW_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink49chargeOut = Canberra-Capital (6) or Kangaroo Valley to Capital (3W) or Dapto-Kangaroo Valley (18), avoid voltage collapse at Darlington Point for loss of the largest Vic generating unit or Basslink
N^^V_NIL_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink41chargeOut = Nil, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N>YSTX_TX_NIL_LVSnowy to NSW: transient stability limits (Yass–Bannaby–Marulan)36dischargeOut= One Yass 330/132kV TX, avoid O/L other Yass 132/330kV transformer on trip of Nil, Feedback
V>>N_NIL_65_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV34dischargeOut = NIL, avoid O/L Murray to Upper Tumut (65) on trip of Wagga to Lower Tumut (051) line, Feedback
V^^N_NIL_1Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV33dischargeOut = Nil, avoid voltage collapse around Murray for loss of all APD potlines
N^^V_MLNK_1Southern NSW: voltage stability for loss of the largest Victorian unit or Basslink19chargeOut = Murraylink, avoid voltage collapse at Southern NSW for loss of the largest Vic generating unit or Basslink
N>>BDBU_060_051Southern NSW: Jindera–Wodonga and Wagga–Lower Tumut 330 kV18dischargeOut= Bundey to Buronga (6F) 330kV Line, avoid O/L Jindera to Wodonga (60) 330kV line on trip of Wagga to Lower Tumut (051) 330kV line, Feedback
Showing the 15 constraints with the most hours; 26 others also included this unit.
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.