Out= NIL, Boyne Island Potlines radialised, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Calliope River to Wurdong (818) 275kV line, Feedback
Out= 8859 (Larcom Creek - Calliope River) + 814 (Calliope River - Gin Gin - Woolooga) 275kV lines, avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
Constraint Automation, O/L 275KV_871:5:I:275@H24_CALV@QLD for CTG LQIC on trip of 812 H67_CALR-H10_BCMB 275kV LINE. Generated by STNET[BNECR4] Host NORREGEEMP7(EMPSYD)
Out= Nil, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Bouldercombe to Raglan (811) 275kV line, Feedback. [NOTE: DS RHS to swamp if 8810+8811 lines O/S]
Constraint Automation, O/L 275KV_812:812:I:275@H10_BCMB@QLD for CTG LQIV on trip of 871 H24_CALV - H40_WURD 275KV. Generated by STNET[BNECR4] Host NORREGEEMP7(EMPSYD)
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.