Period, last 90 days (27 Aug 2026 to 24 Nov 2026, 2,160 hours).
Capacity
252 MW
Intervals limited
4.5%
Curtailed while constrained
0.0 GWh
Other curtailment
0.1 GWh
Value of constrained curtailment
$0.0m
Median local price adj.
−182 $/MWh

Share of intervals limited, by hour of day

Calendar months that overlap the period.

Share of intervals limited, by month

Constraints behind it

ConstraintAreaHoursDirectionAEMO description
Q>LCCP_CLWU_BCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)50dischargeOut= Larcom Creek to Calliope River (8859), avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
Q>NIL_CLWU_CPWU_RADCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)21dischargeOut= NIL, Boyne Island Potlines radialised, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Calliope River to Wurdong (818) 275kV line, Feedback
Q>X_LCWO_CLWU_BCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)13dischargeOut= 8859 (Larcom Creek - Calliope River) + 814 (Calliope River - Gin Gin - Woolooga) 275kV lines, avoid O/L Calvale to Wurdong (871) on trip of Bouldercombe to Calliope River (812) line, Feedback
C_Q_WAMBOWF2_099Commissioning / hold point constraint for Wambo 2 wind farm of +99.212dischargeCommissioning / hold point constraint for Wambo 2 wind farm of +99.2 MW - HP1
Q>NIL_CLWU_BCRGCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)1dischargeOut= Nil, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Bouldercombe to Raglan (811) 275kV line, Feedback. [NOTE: DS RHS to swamp if 8810+8811 lines O/S]
Q>NIL_CLWU_LCCPCentral Queensland: Gladstone corridor (Calliope River, Larcom Creek, Wurdong 275 kV)0dischargeOut= Nil, avoid O/L Calvale to Wurdong (871) 275kV line on trip of Larcom Creek to Calliope River (8859) 275kV line, Feedback
Source: AEMO. Summary built 25 Nov 2026 02:41; data through 25 Nov 2026 01:40 NEM time. “Intervals limited” measures exposure (a binding constraint that includes the unit), not lost output. “Curtailed while constrained” is the unit’s curtailment in intervals when such a constraint was binding, valued at the regional price with negative prices counted as zero. Constraint definitions arrive from AEMO about a month after the event, so recent constraints show “description pending”.